Build stamp
Code and build · BUILD.json. On a deployment this row is a control; the demo shows the row with the reading its source supports.
Evidence
- Running
- tree 2d7f220f645b, commit 960264d9b3ec
- Built
- tree 2d7f220f645b, built 2026-09-08
- Latest known
- release 1.1.0, tree 2d7f220f645b
- Source
- git rev-parse HEAD:core
- Checked
- 2 hours ago
- Cadence
- none — record only
- Mode
- record only
- State
- current
- Backup unit
- The previous release, kept (3 images retained).
- Recovery
- Roll the release back; the stamp of the previous image comes back with it.
The five steps
Plan, back up, apply, verify, recover — in record only mode. On a deployment each step runs, is verified and lands on the audit trail; every component on the demo is current, so every step reads done.
- ✓ done Plan The stamp the release will carry - release, commit, tree, build date, image digest - is shown beside the stamp that is running; the admin confirms.
- ✓ done Back up The running stamp and its digest are recorded as the point of return; the previous image stays kept.
- ✓ done Apply The stamp is written by the workstation build into the image; the apply is the image update.
- ✓ done Verify The running image reports the stamp the manifest names, field for field, and the healthcheck is green.
- ✓ done Recover Bring the previous digest up; its stamp is the proof the rollback landed, and the sweep runs again.
Every row behind this reading (5)
| Field | Value | Source |
|---|---|---|
| release | 1.1.0 | CHANGELOG.md |
| commit | 960264d9b3ec (tag 1.1) | git for-each-ref refs/tags |
| built_at | 2026-09-08 | git log -1 --format=%cs (HEAD commit date) or --stamp |
| tree_sha | 2d7f220f645b | git rev-parse HEAD:core |
| image_digest | none: the demo runs no image | docker-compose.yml |
History
Applies and recoveries of this row, from the update journal. On a deployment every apply and every recovery lands here as it completes.
No apply or recovery recorded for this row. The demo's journal holds one completed update, of Running image.
Acknowledge: keep as is until <date> because <reason> — on a deployment this line is a form, audited as system.component_acknowledged; the demo shows the words.