Hospital · CCN 380020

Mckenzie-Willamette Medical Center

1460 G Street, Springfield, OR 97477 · Lane County
Part of Quorum Health Corporation · 113 beds · 5
Metropolitan area core: primary flow within an urbanized area of 50,000 and greater

30 admission types 46 outpatient services price file: ok
Billed per dollar paid, all admissions
4.39×
$48.9M billed against $11.1M paid across 597 Medicare discharges; the national figure is 5.03×.
1.1%
of adults in Lane County have medical debt in collections
7.9%
uninsured in the county · state 7.4%
$70K
median household income
4.2×
billed ÷ paid, inpatient, summed over the county's hospitals in the Medicare file (2 in the inpatient or outpatient file)ⓘ
34.3%
obesity in the countyⓘ
10.8%
diagnosed diabetes (PLACES)
6.8%
coronary heart disease (PLACES)
—
median age · — below poverty (ACS)
01 · Admissions

What it billed Medicare, by admission type

Average charge submitted and average total payment per discharge, 2024. Rows under 11 discharges are suppressed by CMS. The last column is the hospital's ratio against its state's for the same admission.

DRG
Admission
Discharges
Charge
Paid
Billed ÷ paid
871
Septicemia or severe sepsis without mv >96 hours with mcc
103
$63,803
$16,545
3.9× st 3.0×
291
Heart failure and shock with mcc
37
$42,194
$10,607
4.0× st 3.1×
470
Major hip and knee joint replacement or reattachment of lower extremity without mcc
32
$86,797
$15,543
5.6× st 3.5×
454
Combined anterior and posterior spinal fusion with cc
31
$172,774
$54,793
3.2× st 3.1×
872
Septicemia or severe sepsis without mv >96 hours without mcc
24
$43,173
$8,498
5.1× st 3.1×
603
Cellulitis without mcc
21
$31,273
$7,473
4.2× st 3.1×
683
Renal failure with cc
19
$30,170
$7,425
4.1× st 3.2×
641
Miscellaneous disorders of nutrition, metabolism, fluids and electrolytes without mcc
19
$30,614
$6,759
4.5× st 3.5×
322
Percutaneous cardiovascular procedures with intraluminal device without mcc
19
$111,458
$19,998
5.6× st 4.1×
330
Major small and large bowel procedures with cc
18
$120,310
$20,589
5.8× st 3.6×
189
Pulmonary edema and respiratory failure
17
$39,695
$10,778
3.7× st 3.5×
236
Coronary bypass without cardiac catheterization without mcc
16
$227,729
$40,314
5.6× st 4.0×
280
Acute myocardial infarction, discharged alive with mcc
16
$44,002
$13,044
3.4× st 3.0×
483
Major joint or limb reattachment procedures of upper extremities
16
$113,962
$21,731
5.2× st 4.6×
682
Renal failure with mcc
15
$42,848
$12,005
3.6× st 3.1×
177
Respiratory infections and inflammations with mcc
15
$56,116
$13,955
4.0× st 2.8×
455
Combined anterior and posterior spinal fusion without cc/mcc
15
$161,418
$39,537
4.1× st 3.0×
281
Acute myocardial infarction, discharged alive with cc
15
$58,479
$7,736
7.6× st 3.6×
193
Simple pneumonia and pleurisy with mcc
14
$36,813
$10,814
3.4× st 2.9×
853
Infectious and parasitic diseases with o.r. procedures with mcc
14
$173,602
$37,028
4.7× st 2.9×
402
Single level combined anterior and posterior spinal fusion except cervical
13
$135,290
$31,755
4.3× st 3.4×
481
Hip and femur procedures except major joint with cc
13
$83,303
$18,226
4.6× st 3.6×
468
Revision of hip or knee replacement without cc/mcc
13
$114,750
$21,651
5.3× st 3.0×
698
Other kidney and urinary tract diagnoses with mcc
12
$41,471
$12,662
3.3× st 2.8×
473
Cervical spinal fusion without cc/mcc
12
$88,212
$20,168
4.4× st 4.4×
640
Miscellaneous disorders of nutrition, metabolism, fluids and electrolytes with mcc
12
$37,478
$10,826
3.5× st 3.3×
522
Hip replacement with principal diagnosis of hip fracture without mcc
12
$95,764
$17,342
5.5× st 3.7×
472
Cervical spinal fusion with cc
12
$92,616
$24,069
3.8× st 3.8×
321
Percutaneous cardiovascular procedures with intraluminal device with mcc or 4+ arteries/
11
$179,653
$23,502
7.6× st 3.9×
638
Diabetes with cc
11
$28,561
$9,007
3.2× st 3.0×
02 · Outpatient

Outpatient services

Comprehensive APCs, Medicare's outpatient payment groups: submitted charge against what Medicare allowed, per service.

APC
Service
Services
Charge
Allowed
Billed ÷ allowed
5115
Level 5 Musculoskeletal Procedures
203
$79,288
$13,193
6.0×
8011
Comprehensive Observation Services
98
$21,657
$2,822
7.7×
5213
Level 3 Electrophysiologic Procedures
58
$172,855
$24,424
7.1×
5116
Level 6 Musculoskeletal Procedures
56
$101,541
$19,338
5.3×
5193
Level 3 Endovascular Procedures
46
$105,818
$11,305
9.4×
5191
Level 1 Endovascular Procedures
45
$36,983
$3,341
11.1×
5375
Level 5 Urology and Related Services
42
$41,837
$5,178
8.1×
5361
Level 1 Laparoscopy and Related Services
40
$56,073
$5,696
9.8×
5114
Level 4 Musculoskeletal Procedures
35
$49,395
$7,272
6.8×
5374
Level 4 Urology and Related Services
31
$31,580
$3,626
8.7×
5223
Level 3 Pacemaker and Similar Procedures
27
$114,053
$11,095
10.3×
5362
Level 2 Laparoscopy and Related Services
21
$77,282
$10,696
7.2×
5112
Level 2 Musculoskeletal Procedures
20
$12,878
$1,672
7.7×
5113
Level 3 Musculoskeletal Procedures
17
$29,008
$3,209
9.0×
5154
Level 4 Airway Endoscopy
15
$26,236
$3,895
6.7×
5194
Level 4 Endovascular Procedures
13
$144,412
$17,498
8.3×
5183
Level 3 Vascular Procedures
11
$30,182
$3,315
9.1×
5432
Level 2 Nerve Procedures
—
—
—
—
5372
Level 2 Urology and Related Services
—
—
—
—
5373
Level 3 Urology and Related Services
—
—
—
—
5465
Level 5 Neurostimulator and Related Procedures
—
—
—
—
5464
Level 4 Neurostimulator and Related Procedures
—
—
—
—
5462
Level 2 Neurostimulator and Related Procedures
—
—
—
—
5376
Level 6 Urology and Related Services
—
—
—
—
5378
Level 8 Urology and Related Services
—
—
—
—
5461
Level 1 Neurostimulator and Related Procedures
—
—
—
—
5414
Level 4 Gynecologic Procedures
—
—
—
—
5072
Level 2 Excision/ Biopsy/ Incision and Drainage
—
—
—
—
5415
Level 5 Gynecologic Procedures
—
—
—
—
5342
Level 2 Abdominal/Peritoneal/Biliary and Related Procedures
—
—
—
—
5341
Level 1 Abdominal/Peritoneal/Biliary and Related Procedures
—
—
—
—
5091
Level 1 Breast/Lymphatic Surgery and Related Procedures
—
—
—
—
5092
Level 2 Breast/Lymphatic Surgery and Related Procedures
—
—
—
—
5094
Level 4 Breast/Lymphatic Surgery and Related Procedures
—
—
—
—
5153
Level 3 Airway Endoscopy
—
—
—
—
5165
Level 5 ENT Procedures
—
—
—
—
5182
Level 2 Vascular Procedures
—
—
—
—
5192
Level 2 Endovascular Procedures
—
—
—
—
5212
Level 2 Electrophysiologic Procedures
—
—
—
—
5222
Level 2 Pacemaker and Similar Procedures
—
—
—
—
5224
Level 4 Pacemaker and Similar Procedures
—
—
—
—
5231
Level 1 ICD and Similar Procedures
—
—
—
—
5232
Level 2 ICD and Similar Procedures
—
—
—
—
5302
Level 2 Upper GI Procedures
—
—
—
—
5313
Level 3 Lower GI Procedures
—
—
—
—
5073
Level 3 Excision/ Biopsy/ Incision and Drainage
—
—
—
—
03 · Its own price file

What the hospital's price-transparency file says

Found via /cms-hpt.txt, the file itself ↗ read as csv-tall, last updated 2026-04-03, template 3.0.0, 91,917 rows scanned, 2,666 distinct code–setting items kept. 2,224 findings against it.

Service
Code
Listed
Cash
Negotiated
Rates
Checks
Computed tomography (CT) of brain blood flow, volume, and timing of flow analysis with contrast
$6,696
$4,017
$3,940
11
clean
Drainage of fluid collection in soft tissue using imaging guidance
$2,032
$1,219
$968
17
clean
Injection for X-ray imaging of breast duct
$544
$327
$316
18
clean
Deep biopsy of bone using needle or trocar
$8,069
$4,841
$3,908
18
clean
Aspiration and/or injection of fluid from small joint using ultrasound guidance
$3,173
$1,904
$1,205
18
clean
Aspiration and/or injection of fluid from medium joint
$1,262
$757
$666
18
clean
Aspiration and/or injection of fluid from medium joint using ultrasound guidance
$3,173
$1,904
$1,767
18
clean
Aspiration and/or injection of fluid large joint using ultrasound guidance
$3,173
$1,904
$1,205
18
clean
Injection of contrast for imaging of shoulder joint
$357
$214
$208
18
clean
Injection of contrast for imaging of elbow joint
$470
$282
$273
18
clean
Injection of contrast for imaging of wrist
$519
$312
$302
18
clean
Injection of contrast for imaging of hip joint
$474
$284
$275
18
clean
Injection of contrast for imaging of hip under anesthesia
$542
$325
$315
18
clean
Injection of contrast for imaging of knee joint
$344
$206
$200
18
clean
Injection for X-ray imaging of ankle
$342
$205
$199
18
clean
Insertion of tube into airway for aspiration of secretions
$340
$204
$250
18
clean
Aspiration of fluid from chest cavity using imaging guidance
$2,543
$1,526
$886
18
clean
Drainage of fluid from chest cavity with insertion of indwelling tube using imaging guidance
$2,470
$1,482
$1,431
18
clean
Drainage of heart sac using imaging guidance
$3,022
$1,813
$1,904
36
clean
Insertion of heart rhythm monitor under skin
$41,625
$24,975
$14,660
18
clean
Removal of heart rhythm monitor from under the skin
$6,602
$3,961
$1,726
18
clean
Insertion of wireless pressure sensor into lung artery through tube with review by radiologist
$13,401
$8,041
$17,841
18
clean
Removal of blood flow assist device in left lower heart chamber through the skin
$1,461
$877
$849
18
clean
Injection to cause blood clot in diseased or pseudoaneurysm of arm or leg
$1,177
$706
$765
36
clean
Injection for X-ray imaging procedure into vein of arm or leg
$335
$201
$170
36
clean
Insertion of tube into vena cava
$789
$473
$399
36
clean
Insertion of tube into vein, first order branch
$4,882
$2,929
$626
36
clean
Insertion of tube into vein, second order branch
$1,154
$692
$584
36
clean
Insertion of tube into right heart or main pulmonary artery
$780
$468
$395
18
clean
Insertion of tube into left or right pulmonary artery
$947
$568
$479
18
clean
Insertion of tube into artery of lobe of lung
$1,096
$658
$555
18
clean
Insertion of needle or tube into artery of neck or brain
$957
$574
$484
18
clean
Insertion of needle or tube into artery of arm or leg
$11,361
$6,816
$5,748
36
clean
Insertion of needle or tube into aorta
$806
$484
$408
18
clean
Insertion of tube into aorta
$984
$591
$498
36
clean
Insertion of tube into chest or arm artery, each first order branch
$1,563
$938
$791
36
clean
Insertion of tube into chest or arm artery, initial second order branch
$1,763
$1,058
$892
36
clean
Insertion of tube into chest or arm artery, initial third order branch
$2,108
$1,265
$1,066
36
clean
Insertion of tube into chest or arm artery, additional second, third order and beyond
$317
$190
$160
18
clean
Insertion of tube into chest aorta for diagnosis or treatment with review by radiologist
$22,119
$13,271
$9,835
36
clean
Insertion of tube into extracranial artery for diagnosis or treatment with review by radiologist
$36,872
$22,123
$15,440
72
clean
Insertion of tube into intracranial artery for diagnosis or treatment with review by radiologist
$56,833
$34,100
$23,799
36
clean
Insertion of tube into internal neck artery for diagnosis or treatment with review by radiologist
$54,610
$32,766
$24,902
36
clean
Insertion of tube into chest artery for diagnosis or treatment with review by radiologist
$32,898
$19,739
$13,776
72
clean
Insertion of tube into brain artery for diagnosis or treatment with review by radiologist
$33,213
$19,928
$15,475
72
clean
Insertion of tube into external neck artery for diagnosis or treatment with review by radiologist
$20,278
$12,167
$10,261
18
clean
Insertion of tube into abdominal, pelvic, or leg artery, each first order branch
$1,610
$966
$815
36
clean
Insertion of tube into abdominal, pelvic, or leg artery, initial second order branch
$1,931
$1,159
$1,122
36
clean
Insertion of tube into abdominal, pelvic, or leg artery, initial third order branch
$2,088
$1,253
$1,057
36
clean
Insertion of tube into abdominal, pelvic, or leg artery, additional second, third, and beyond
$317
$190
$160
18
clean
Insertion of needle into vein for collection of blood sample
$31
$18
$8
18
clean
Transfusion of blood or blood products
$1,948
$1,169
$1,132
162
clean
Insertion of tube into portal vein of liver
$2,803
$1,682
$1,033
18
clean
Mechanical separation of white blood cells from blood
$6,578
$3,947
$3,422
18
clean
Mechanical separation of red blood cells from blood
$6,578
$3,947
$3,422
18
clean
Mechanical separation of plasma from blood
$6,578
$3,947
$4,102
15
clean
Insertion of non-tunneled central venous tube for infusion (younger than 5 years)
$5,617
$3,370
$3,651
18
clean
Insertion of non-tunneled central venous tube for infusion (5 years or older)
$6,326
$3,795
$3,675
36
clean
Insertion of tunneled central venous tube for infusion (younger than 5 years)
$12,645
$7,587
$6,922
18
clean
Insertion of tunneled central venous tube for infusion (5 years or older)
$11,070
$6,642
$4,973
54
clean
Insertion of central venous tube with port (younger than 5 years)
$15,098
$9,059
$5,662
18
clean
Insertion of central venous tube with pump
$15,098
$9,059
$7,528
18
clean
Insertion of 2 central venous tubes in 2 veins for infusion
$15,098
$9,059
$5,662
18
clean
Insertion of 2 central venous tubes in 2 veins with port
$15,098
$9,059
$7,528
18
clean
Removal of tunneled central venous tube
$2,765
$1,659
$1,423
18
clean
Removal of central venous tube with port or pump
$5,676
$3,406
$3,209
36
clean
Collection of blood sample from implanted device
$328
$197
$221
18
clean
Collection of blood sample from central venous tube
$328
$197
$221
18
clean
Declotting of central venous tube
$1,028
$617
$690
36
clean
Repositioning of central venous tube using fluoroscopic guidance
$5,617
$3,370
$3,194
18
clean
Contrast injection for imaging to evaluate central venous access device
$1,259
$756
$545
36
clean
Artery puncture collection of blood sample
$468
$281
$301
18
clean
Revision of shunts to bypass blood flow to liver with review by radiologist
$54,450
$32,670
$12,476
36
clean
Insertion of vena cava filter with review by radiologist
$20,640
$12,384
$11,492
36
clean
Repositioning of vena cava filter with review by radiologist
$14,240
$8,544
$7,206
36
clean
Removal of vena cava filter with review by radiologist
$14,240
$8,544
$7,206
36
clean
Retrieval of foreign body in blood vessel with review by radiologist
$14,275
$8,565
$7,223
36
clean
Biopsy of blood vessel using tube
$10,608
$6,365
$6,707
18
clean
Other procedure on blood vessel
$4,884
$2,931
$1,528
18
clean
Injection procedure for imaging of lymphatic system
$464
$279
$235
18
clean
Injection of radioactive material for X-ray identification of lymph node
$1,101
$661
$640
18
clean
Biopsy of saliva gland
$11,320
$6,792
$3,765
18
clean
Dilation of saliva gland duct and insertion of tube
$1,678
$1,007
$975
18
clean
Destruction of stone of bile or pancreatic duct using a flexible endoscope
$11,130
$6,678
$6,943
18
clean
Insertion of stomach tube through nose or mouth using fluoroscopic guidance
$1,587
$952
$814
18
clean
Replacement of stomach stoma tube
$1,266
$759
$640
18
clean
Needle biopsy of liver through skin
$4,861
$2,916
$2,824
18
clean
Insertion of tube into gallbladder using imaging guidance with review by radiologist
$4,788
$2,873
$3,357
18
clean
Biopsy of pancreas
$5,608
$3,365
$2,573
18
clean
Drainage of fluid from abdominal cavity using imaging guidance
$4,808
$2,885
$2,024
36
clean
Irrigation of abdominal cavity
$4,579
$2,747
$2,317
18
clean
Injection of contrast through abdominal cavity tube for X-ray study
$277
$166
$161
18
clean
Insertion of stomach tube using fluoroscopic guidance with contrast
$6,287
$3,772
$3,653
18
clean
Insertion of small bowel tube using fluoroscopic guidance with contrast
$6,287
$3,772
$3,257
36
clean
Replacement of stomach or large bowel tube using fluoroscopic guidance with contrast
$3,132
$1,879
$1,564
36
clean
Replacement of small bowel tube using fluoroscopic guidance with contrast
$2,404
$1,442
$1,397
36
clean
Replacement of stomach-to-small bowel tube using fluoroscopic guidance with contrast
$2,404
$1,442
$1,563
36
clean
Simple surgical treatment of kidney stone with imaging guidance
$23,248
$13,949
$11,496
18
clean
Shock wave crushing of kidney stones
$24,770
$14,862
$10,816
18
clean
Injection of bladder and ureter for imaging
$496
$297
$288
18
clean
Injection procedure for imaging of bladder during voiding
$319
$191
$185
18
clean
Injection procedure through bladder and urethra for X-ray imaging
$451
$270
$262
18
clean
Ultrasound measurement of bladder capacity after voiding
$852
$511
$277
18
clean
Injection procedure for imaging of penile erection
$568
$341
$327
18
clean
Incision and drainage of abscess of external female genitals
$1,324
$795
$679
18
clean
Fetal test
$739
$444
$415
18
clean
Turning of fetus through external manipulation
$6,640
$3,984
$4,054
18
clean
Needle biopsy of thyroid through skin
$2,270
$1,362
$1,453
18
clean
Aspiration of cerebrospinal fluid and injection in shunt tubing or reservoir
$2,765
$1,659
$1,503
18
clean
Aspiration of fluid from cyst of spinal cord or fluid-filled cavity
$3,482
$2,089
$2,079
18
clean
Removal of cerebrospinal fluid with lower back spinal tap for diagnostic test
$1,951
$1,171
$1,310
18
clean
Removal of cerebrospinal fluid with lower back spinal tap
$1,772
$1,063
$1,190
18
clean
Injection of blood or blood clot into spinal canal
$3,404
$2,042
$1,743
36
clean
Injection of contrast for imaging of each level of lower spine
$1,108
$665
$458
18
clean
Injection of contrast for imaging of each level of middle or upper spine
$1,070
$642
$448
18
clean
X-ray of upper spinal canal with review by radiologist
$8,393
$5,036
$3,174
18
clean
X-ray of middle spinal canal with review by radiologist
$8,393
$5,036
$3,174
18
clean
X-ray of lower spinal canal with review by radiologist
$8,393
$5,036
$3,174
18
clean
X-ray of multiple regions of spinal canal with review by radiologist
$8,393
$5,036
$3,174
18
clean
Injection of substance into middle or upper spine canal using imaging guidance
$4,057
$2,434
$1,994
18
clean
Injection of substance into lower spine canal using imaging guidance
$4,057
$2,434
$1,994
18
clean
Insertion of tube and injection of substance into middle or upper spine canal using imaging guidance
$4,057
$2,434
$2,131
18
clean
Insertion of tube and injection of substance into lower spine canal using imaging guidance
$4,269
$2,561
$2,185
18
clean
Removal of spinal fluid with lower back spinal tap for diagnostic test using imaging guidance
$1,951
$1,171
$1,310
36
clean
X-ray of part of lower jaw, 1-4 views
$742
$445
$307
36
clean
X-ray of lower jaw, minimum of 4 views
$742
$445
$349
36
clean
X-ray of face bones, 1-2 views
$742
$445
$307
36
clean
X-ray of face bones, minimum of 3 views
$742
$445
$349
36
clean
X-ray of nose bones, minimum of 3 views
$742
$445
$307
36
clean
X-ray of eye socket, minimum of 4 views
$742
$445
$349
36
clean
X-ray of paranasal sinus, 1-2 views
$742
$445
$307
36
clean
X-ray of paranasal sinus, minimum of 3 views
$742
$445
$307
36
clean
X-ray of bone at base of skull
$1,234
$741
$447
18
clean
X-ray of skull, 1-3 views
$742
$445
$349
36
clean
X-ray of skull, minimum of 4 views
$1,234
$741
$472
36
clean
X-ray of jaw joint on 1 side of mouth
$742
$445
$307
36
clean
X-ray of jaw joints on both sides of mouth
$742
$445
$307
36
clean
X-ray of lower jaws, upper jaws and teeth
$742
$445
$307
36
clean
X-ray of soft tissue of neck
$742
$445
$307
36
clean
Imaging of voice box with speech evaluation
$1,455
$873
$710
18
clean
Review by radiologist of salivary structure image
$1,397
$838
$695
18
clean
CT scan head or brain without contrast
$3,465
$2,079
$774
18
clean
CT scan head or brain with contrast
$5,477
$3,286
$823
18
clean
CT scan of head or brain before and after contrast
$6,064
$3,639
$823
18
clean
CT scan of cranial cavity without contrast
$3,459
$2,075
$773
18
clean
CT scan of cranial cavity with contrast
$5,477
$3,286
$823
18
clean
CT scan of cranial cavity before and after contrast
$6,064
$3,639
$823
18
clean
CT scan of face without contrast
$3,459
$2,075
$773
18
clean
CT scan of face with contrast
$5,477
$3,286
$823
18
clean
CT scan of face before and after contrast
$6,064
$3,639
$823
18
clean
CT scan of soft tissue of neck without contrast
$3,459
$2,075
$773
18
clean
CT scan of soft tissue of neck with contrast
$5,477
$3,286
$823
18
clean
CT scan of soft tissue of neck before and after contrast
$6,064
$3,639
$823
18
clean
CT scan of blood vessels of head with contrast
$6,259
$3,755
$823
18
clean
CT scan of blood vessels of neck with contrast
$6,259
$3,755
$823
18
clean
MRI scan of bone of eye socket, face, and/or neck without contrast
$4,282
$2,569
$1,002
18
clean
MRI scan of bone of eye socket, face, and/or neck before and after contrast
$6,629
$3,977
$1,300
18
clean
MRI scan of blood vessels of head without contrast
$4,282
$2,569
$1,002
18
clean
MRI scan of blood vessels of head with contrast
$5,258
$3,155
$1,145
18
clean
MRI scan of blood vessels of head before and after contrast
$6,629
$3,977
$1,300
18
clean
MRI scan of blood vessels of neck without contrast
$4,282
$2,569
$1,002
18
clean
MRI scan of blood vessels of neck before and after contrast
$6,629
$3,977
$1,300
18
clean
MRI scan of brain without contrast
$4,292
$2,575
$1,003
18
clean
MRI scan of brain with contrast
$5,258
$3,155
$1,145
18
clean
MRI scan of brain before and after contrast
$6,639
$3,984
$1,301
18
clean
X-ray of chest, 1 view
$742
$445
$307
36
clean
X-ray of chest, 2 views
$1,129
$678
$409
36
clean
X-ray of chest, 3 views
$1,518
$911
$550
18
clean
X-ray of chest, minimum of 4 views
$1,905
$1,143
$375
36
clean
X-ray of ribs on side of body, 2 views
$742
$445
$307
36
clean
X-ray of ribs on side of body, minimum of 3 views
$742
$445
$349
36
clean
X-ray of ribs on both sides of body, 3 views
$742
$445
$349
36
clean
X-ray of ribs on both sides of body, minimum of 4 views
$1,234
$741
$472
36
clean
X-ray of chest bone, minimum of 2 views
$742
$445
$307
36
clean
X-ray of joint between breast and collar bones, minimum of 2 views
$742
$445
$307
36
clean
CT scan of chest without contrast
$3,459
$2,075
$773
18
clean
CT scan of chest with contrast
$5,485
$3,291
$823
18
clean
CT scan of chest before and after contrast
$6,064
$3,639
$823
18
clean
Low dose CT scan of chest for lung cancer screening
$494
$297
$250
18
clean
CT scan of blood vessels of chest with contrast
$6,270
$3,762
$823
18
clean
MRI scan of chest without contrast
$3,121
$1,873
$871
18
clean
MRI scan of chest with contrast
$4,021
$2,412
$1,676
18
clean
MRI scan of chest before and after contrast
$4,923
$2,954
$1,108
18
clean
X-ray of spine, 1 view
$742
$445
$307
36
clean
X-ray of upper spine, 2-3 views
$742
$445
$307
36
clean
X-ray of upper spine, 4-5 views
$1,234
$741
$472
36
clean
X-ray of upper spine, 6 or more views
$1,234
$741
$472
36
clean
X-ray of middle spine, 2 views
$742
$445
$349
36
clean
X-ray of middle spine, 3 views
$742
$445
$349
36
clean
X-ray of middle and lower spine, 2 views
$742
$445
$307
36
clean
X-ray of entire middle and lower spine, 2-3 views
$485
$291
$245
36
clean
X-ray of entire middle and lower spine, 4-5 views
$925
$555
$395
36
clean
X-ray of entire middle and lower spine, minimum of 6 views
$925
$555
$395
36
clean
X-ray of lower and sacral spine, 2-3 views
$742
$445
$349
36
clean
X-ray of lower and sacral spine, minimum of 4 views
$1,234
$741
$472
36
clean
CT scan of upper spine without contrast
$3,459
$2,075
$773
18
clean
CT scan of upper spine with contrast
$5,477
$3,286
$992
18
clean
CT scan of upper spine before and after contrast
$6,064
$3,639
$823
18
clean
CT scan of middle spine without contrast
$3,459
$2,075
$773
18
clean
CT scan of middle spine with contrast
$5,477
$3,286
$823
18
clean

Showing the first 200 of 2,666 code–setting items in the file, verified codes first — every row as JSON →

Findings

Service
Severity
Rule
Detail
warn
mrf_negotiated_above_gross_systematic
1,973 of 2,416 comparable items (82%) fail this check the same way — the column does not mean what the template says it means, for this file or for this reader; e.g. highest negotiated rate $18,078 exceeds the gross charge $6,696
CPT C1765/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1790/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1767/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1768/o
info
mrf_item_fields_vary
this code and setting cover at least 8 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1805/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 75989/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT C1769/o
info
mrf_item_fields_vary
this code and setting cover at least 20 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1771/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 76010/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1885/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT C1773/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1920/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1776/o
info
mrf_item_fields_vary
this code and setting cover at least 11 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1938/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 76376/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 76377/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT C1778/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1956/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1780/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1781/o
info
mrf_item_fields_vary
this code and setting cover at least 14 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2020/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1783/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2060/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1785/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2175/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2185/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1788/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1789/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1813/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2248/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2250/o
info
mrf_item_fields_vary
this code and setting cover at least 6 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2260/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2270/o
info
mrf_item_fields_vary
this code and setting cover at least 8 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 76815/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J2274/o
info
mrf_item_fields_vary
this code and setting cover at least 7 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1874/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2300/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1875/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2305/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1876/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1877/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1880/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2354/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1884/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1885/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1887/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2371/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1888/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1889/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2405/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1892/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1893/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2430/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1894/o
info
mrf_item_fields_vary
this code and setting cover at least 8 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2440/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C1897/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2543/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2550/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2560/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 71048/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J2597/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C2618/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2690/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 87631/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J2704/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2710/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 82670/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J2720/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C2625/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C2627/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C2628/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT C2630/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2795/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2919/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J2997/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3010/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 82803/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J3260/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3262/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3301/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3360/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3373/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3410/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3430/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3475/o
info
mrf_item_fields_vary
this code and setting cover at least 9 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT G0008/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J3480/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J3489/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7030/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT G0260/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7042/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7050/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73040/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, max differ, so no cross-line comparison was made for this item
CPT G0378/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min differ, so no cross-line comparison was made for this item
CPT J7120/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7121/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7168/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT G0463/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73092/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J7189/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73120/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73200/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73201/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0153/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0168/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7312/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73206/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0169/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73218/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0171/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73219/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73220/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73221/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73222/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73223/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0278/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0280/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7512/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0282/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7515/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J8501/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0290/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0295/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J8540/o
info
mrf_item_fields_vary
this code and setting cover at least 6 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J9000/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 90375/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0457/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J9033/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J9045/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J9060/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73592/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 83986/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0561/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J9100/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 90656/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J9171/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 90662/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73700/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J9201/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36011/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73701/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0612/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73702/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0613/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73718/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 73720/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0637/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73721/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 90715/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0640/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73722/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0641/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 73723/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 90744/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J9260/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0666/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 74021/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J9280/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0688/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36222/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0690/o
info
mrf_item_fields_vary
this code and setting cover at least 8 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36223/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0692/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36224/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0694/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36225/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 81002/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36226/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 99152/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0696/o
info
mrf_item_fields_vary
this code and setting cover at least 6 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 99153/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0698/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT L8606/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0702/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 99195/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0712/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0713/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36430/o
info
mrf_item_fields_vary
this code and setting cover at least 8 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 99211/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0736/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36556/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 36558/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT P9045/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0885/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT P9047/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0895/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1050/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1100/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT Q0161/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT Q0162/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 37183/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT Q0177/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1163/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1165/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT Q2009/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J1171/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1250/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1260/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J1265/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item

Showing the first 200 of 2,224 findings, errors first — every finding as JSON →

Sources for this hospital

the files read, as fetched — not our copy of them
  1. MUP_INP_RY26_P03_V10_DY24_PrvSvc.CSV · 38.0M bytes · fetched 2026-08-21 · sha256 2ab6da15be4c… · publisher's page · public domain (US federal)
  2. MUP_OUT_RY26_P04_V10_DY24_Prov_Svc.csv · 28.1M bytes · fetched 2026-08-21 · sha256 f293918edbf6… · publisher's page · public domain (US federal)
  3. chsp-hospital-linkage-2023.csv · 1.5M bytes · fetched 2026-08-21 · sha256 a86146f10c8d… · publisher's page · public; cite AHRQ Compendium of U.S. Health Systems
  4. 2020 ZCTA to County relationship file · US Census Bureau · 2020
    tab20_zcta520_county20_natl.txt · 6.8M bytes · fetched 2026-08-21 · sha256 3ed41278d637… · publisher's page · public domain (US federal)
  5. · csv-tall · 29.6M bytes · fetched 2026-08-25 · sha256 61bc63be5c5a…

Every figure on this page is computed from these files by pipeline/prices/; the same rows are in the API.

Source rows for this hospital as JSON: inpatient · outpatient · price file. CMS, Medicare Inpatient and Outpatient Hospitals by Provider and Service, 2024.