Service
Code
Listed
Cash
Negotiated
Rates
Checks
Red blood cell typing
$3,576
$2,682
$1,588
29
clean
Molecular pathology test for liver disease, including non-alcohol liver disease (NASH FibroSURE)
$3,195
$2,397
$1,419
29
clean
MicroRNA gene analysis of thyroid nodule tissue
$31,819
$23,864
$3,002
29
clean
DNA gene analysis for acute myelogenous leukemia
$4,246
$3,184
$306
58
clean
Measurement of glycosylated acute phase proteins
$239
$179
$34
29
clean
Testing for presence of prion protein in cerebrospinal fluid
$4,375
$3,281
$1,943
29
clean
DNA gene analysis of 324 genes in solid organ tumor tissue
$28,305
$21,229
$12,568
29
clean
Measurement of antibodies to Merkel cell polyoma virus oncoprotein in serum
$2,441
$1,831
$1,084
29
clean
Detection of Immunoglobulin paraprotein (M-protein) in blood or urine
$981
$736
$78
29
clean
Cell-free DNA sequencing of disease-causing organisms in plasma specimen, with report for significant organisms
$15,909
$11,932
$2,126
29
clean
Injections of one side of sacrum for enlargement, 1 or more needles, accessed through the skin
$16,965
$12,723
$8,369
29
clean
Injections of both sides of sacrum for enlargement, 2 or more needles, accessed through the skin
$25,469
$19,102
$12,255
29
clean
Test for detection of respiratory disease-causing organisms from back of nose and throat (nasopharynx) specimen, 22 target organisms including severe acute respiratory syndrome coronavirus 2
$772
$579
$417
29
clean
Gene analysis of 10 genes and 37 RNA fusions and expression of 4 mRNA markers, next-generation sequencing, in fine needle aspirate of thyroid to evaluate risk of thyroid cancer
$4,761
$3,571
$1,440
29
clean
Enzyme immunoassay analysis of beta-amyloid fragments in cerebral spinal fluid to evaluate mild mental impairment
$4,819
$3,614
$385
29
clean
Phase separation and immunoassay evaluation of prostate-specific antigen (PSA) in plasma to evaluate risk of prostate cancer
$1,587
$1,190
$760
29
clean
Testing of plasma or serum for 16 perfluoroalkyl substances (PFAS) compounds
$1,325
$993
$199
29
clean
High dose rate electronic brachytherapy, internal
$6,749
$5,062
$2,997
29
clean
Insertion or replacement of pulse generator and electrodes of heart contractility modulator system
$92,218
$69,164
$45,491
29
clean
Programming evaluation of heart contractility modulator system
$188
$141
$83
29
clean
Interrogation evaluation of heart contractility modulator system
$272
$204
$121
29
clean
Glycine receptor alpha1 IgG live cell-binding assay in serum or cerebral spinal fluid (CSF)
$3,355
$2,516
$268
29
clean
Next-generation sequencing of DNA from tissue sample of 648 genes with comparative sequence analysis from a matched normal blood or saliva specimen in solid tumor cancer
$20,250
$15,188
$4,500
29
clean
Insertion or replacement of complete monitoring system for deficient blood flow in heart muscle using imaging guidance
$54,596
$40,947
$26,932
29
clean
Repair of valve between upper right and lower right chambers of heart (tricuspid valve) using prosthesis delivered via catheter, accessed through skin; initial prosthesis
$73,213
$54,910
$36,116
22
clean
Repair of valve between upper right and lower right chambers of heart (tricuspid valve) using prosthesis delivered via catheter, accessed through skin; each additional prosthesis
$73,213
$54,910
$36,116
21
clean
Insertion or replacement of implantable cardioverter-defibrillator system with electrodes under breastbone
$195,619
$146,714
$72,879
28
clean
Irreversible electroporation destruction of growths of internal organ, accessed through skin
$65,488
$49,116
$24,512
28
clean
Removal or reduction of mass within heart by suction through catheter
$11,521
$8,641
$6,376
56
clean
Quantitative magnetic resonance analysis of tissue composition without diagnostic MRI examination
$7,310
$5,482
$875
28
clean
Quantitative magnetic resonance analysis of tissue composition with diagnostic MRI examination
$2,089
$1,567
$873
29
clean
Quantitative ultrasound tissue characterization with interpretation and report, obtained with diagnostic ultrasound examination of same anatomy
$580
$435
$286
22
clean
Digitization of glass microscope slides for level II surgical pathology
$29
$22
$10
22
clean
Digitization of glass microscope slides for level III surgical pathology
$29
$22
$10
22
clean
Digitization of glass microscope slides for level IV surgical pathology
$29
$22
$11
22
clean
Digitization of glass microscope slides for level V surgical pathology
$29
$22
$23
22
clean
Digitization of glass microscope slides for Group I special stain for microorganisms
$29
$22
$13
22
clean
Digitization of glass microscope slides for Group II special stain
$29
$22
$11
22
clean
Digitization of glass microscope slides for immunohistochemistry or immunocytochemistry, initial single antibody stain procedure
$29
$22
$13
22
clean
Digitization of glass microscope slides for immunohistochemistry or immunocytochemistry, each additional single antibody stain procedure
$29
$22
$12
22
clean
Digitization of glass microscope slides for immunohistochemistry or immunocytochemistry, each multiplex antibody stain procedure
$29
$22
$19
22
clean
Digitization of glass microscope slides for morphometric analysis, tumor immunohistochemistry, each manual single antibody stain procedure
$29
$22
$14
22
clean
Transcatheter insertion of permanent dual-chamber leadless pacemaker using fluoroscopy and device interrogation of right atrial and right ventricular pacemaker components
$124,092
$93,069
$55,097
29
clean
Insertion of permanent single-chamber leadless pacemaker for pacing the right upper heart chamber using imaging guidance
$123,963
$92,972
$55,040
29
clean
Simple or single drainage of skin abscess
$3,008
$2,256
$1,335
29
clean
Complicated or multiple drainage of skin abscess
$4,721
$3,541
$2,096
29
clean
Aspiration of abscess, blood, or cyst
$1,845
$1,384
$819
29
clean
Removal of noncancer thickened skin growth, 1 growth
$988
$741
$439
29
clean
Removal of noncancer thickened skin growth, 2-4 growths
$988
$741
$439
29
clean
Removal of noncancer thickened skin growth, more than 4 growths
$1,059
$794
$470
29
clean
Removal of blood accumulation under fingernail or toenail
$814
$610
$361
29
clean
Permanent removal fingernail or toenail
$3,588
$2,691
$1,593
29
clean
Removal of drug delivery implant from tissue
$2,277
$1,708
$1,011
29
clean
Extensive or complicated repair of surface wound reopening
$11,033
$8,275
$5,443
29
clean
Destruction of precancer skin growth, 1 growth
$649
$487
$320
29
clean
Destruction of precancer skin growth, 2-14 growths
$312
$234
$138
29
clean
Application of chemical to stop tissue regrowth in wound
$738
$553
$350
29
clean
Deep biopsy of bone using needle or trocar
$17,605
$13,204
$7,817
29
clean
Injection into tendon or ligament
$1,874
$1,406
$907
58
clean
Injection into tendon at attachment to bone or muscle
$1,874
$1,406
$832
29
clean
Injection of trigger points, 1-2 muscles
$1,874
$1,406
$832
29
clean
Injection of trigger points, 3 or more muscles
$2,010
$1,507
$892
29
clean
Insertion of needle, 1-2 muscles
$115
$86
$54
29
clean
Insertion of needle, 3 muscles or more
$115
$86
$54
29
clean
Aspiration and/or injection of fluid from large joint
$2,010
$1,507
$945
58
clean
Placement of device in muscle to monitor fluid pressure
$4,845
$3,634
$1,329
29
clean
Destruction of growths and adjacent soft tissue
$48,881
$36,661
$24,113
29
clean
Freezing of growth of bone and adjacent soft tissue
$48,881
$36,661
$21,703
29
clean
Stabilization of upper spine bone
$70,411
$52,808
$31,262
29
clean
Stabilization of lower spine bone
$70,411
$52,808
$31,262
29
clean
Stabilization of spine bone, each additional bone
$14,044
$10,533
$6,235
29
clean
Treatment of broken middle spine bone with placement of stabilizing device using imaging guidance
$70,411
$52,808
$31,262
29
clean
Treatment of broken lower spine bone with placement of stabilizing device
$70,411
$52,808
$31,262
29
clean
Treatment of broken spine bone with stabilizing device, each additional segment
$49,160
$36,870
$21,827
29
clean
Removal of foreign body of foot tissue, accessed beneath the skin
$4,596
$3,447
$2,041
29
clean
Placement of strapping to chest
$751
$563
$333
58
clean
Placement of strapping to shoulder
$506
$379
$240
58
clean
Placement of strapping to elbow or wrist
$506
$379
$225
58
clean
Placement of strapping to hand or finger
$138
$103
$68
58
clean
Placement of strapping to knee
$506
$379
$240
58
clean
Placement of strapping to ankle or foot
$506
$379
$250
58
clean
Strapping, Unna boot
$1,072
$804
$476
29
clean
Application of vein wound compression bandages on lower leg, ankle, and foot
$758
$569
$360
87
clean
Application of vein wound compression bandages on upper arm, forearm, hand, and fingers
$758
$569
$337
58
clean
Other casting or wrapping procedure
$732
$549
$325
58
clean
Emergent insertion of breathing tube into windpipe using an endoscope
$1,339
$1,004
$595
29
clean
Diagnostic exam of voice box using an endoscope with mirror
$621
$466
$356
29
clean
Exam to assess movement of vocal cord flaps using an endoscope
$1,763
$1,322
$783
29
clean
Emergent incision of windpipe for insertion of breathing tube
$1,472
$1,104
$755
29
clean
Exam of windpipe and lung airways through permanent windpipe opening using an endoscope
$3,234
$2,425
$1,436
29
clean
Removal of fluid from between lung and chest cavity
$6,124
$4,593
$2,908
29
clean
Aspiration of fluid from chest cavity using imaging guidance
$3,860
$2,895
$1,714
29
clean
Other procedure on lung and lung lining
$5,313
$3,985
$1,965
87
clean
Surgical removal of piece of sac covering heart for drainage
$8,790
$6,593
$3,903
29
clean
Insertion of pacemaker and upper heart chamber electrode
$77,796
$58,347
$34,541
29
clean
Insertion of pacemaker and lower heart chamber electrode
$77,796
$58,347
$34,541
29
clean
Insertion of pacemaker and upper and lower heart chamber electrode
$96,272
$72,204
$42,745
29
clean
Insertion of temporary pacemaker lead in single heart chamber
$35,591
$26,694
$15,803
29
clean
Insertion of pacemaker pulse generator with existing single lead
$63,019
$47,264
$15,529
29
clean
Insertion of pacemaker pulse generator with existing dual leads
$73,536
$55,152
$19,614
29
clean
Insertion of 2 chamber pacemaker system
$97,073
$72,805
$23,909
29
clean
Repositioning of pacemaker or defibrillator electrode
$31,833
$23,874
$7,840
29
clean
Insertion of 1 electrode for permanent pacemaker or defibrillator
$31,833
$23,874
$14,134
29
clean
Insertion of 2 electrodes for permanent pacemaker or defibrillator
$35,888
$26,916
$15,529
29
clean
Repair of electrode for permanent pacemaker or defibrillator
$24,237
$18,178
$7,068
29
clean
Repair of 2 electrodes for permanent pacemaker or defibrillator
$21,602
$16,201
$7,068
29
clean
Insertion of pacemaker pulse generator with existing multiple leads
$69,660
$52,245
$32,532
29
clean
Relocation of pacemaker skin pocket
$10,595
$7,946
$4,704
29
clean
Relocation of defibrillator skin pocket
$37,338
$28,003
$9,196
29
clean
Insertion of left lower heart electrode and attachment to pacemaker or defibrillator
$84,207
$63,155
$20,740
29
clean
Insertion of left lower heart electrode for pacemaker or defibrillator
$78,471
$58,853
$19,327
29
clean
Repositioning of left lower heart electrode
$23,716
$17,787
$7,068
29
clean
Removal and replacement of single lead permanent pacemaker
$78,135
$58,601
$19,245
29
clean
Removal and replacement of dual lead permanent pacemaker
$69,660
$52,245
$19,614
29
clean
Removal and replacement of multiple lead permanent pacemaker
$70,072
$52,554
$32,532
29
clean
Insertion of defibrillator with existing dual leads
$118,242
$88,681
$41,742
29
clean
Insertion of defibrillator with existing multiple leads
$119,329
$89,496
$53,013
29
clean
Removal of permanent pacemaker pulse generator
$21,888
$16,416
$10,395
29
clean
Removal of single electrode from right heart
$48,085
$36,064
$11,843
29
clean
Removal of dual electrodes from right heart
$61,209
$45,907
$15,076
29
clean
Insertion of defibrillator with existing single lead
$117,495
$88,121
$41,742
29
clean
Removal of defibrillator
$16,044
$12,033
$7,068
29
clean
Removal of defibrillator electrodes through vein
$61,209
$45,907
$15,076
29
clean
Insertion of implantable defibrillator system
$119,329
$89,496
$53,013
116
clean
Removal and replacement of single lead defibrillator
$117,495
$88,121
$41,742
29
clean
Removal and replacement of dual lead defibrillator
$118,242
$88,681
$41,742
29
clean
Removal and replacement of multiple lead defibrillator
$119,329
$89,496
$53,013
29
clean
Insertion or replacement of defibrillator with electrode
$119,003
$89,252
$56,514
29
clean
Insertion of defibrillator electrode
$54,129
$40,597
$24,033
29
clean
Removal of defibrillator electrode
$18,142
$13,607
$8,055
29
clean
Repositioning of defibrillator electrode
$19,296
$14,472
$8,567
29
clean
Insertion of permanent leadless pacemaker using imaging guidance
$119,003
$89,252
$52,837
29
clean
Removal of permanent leadless pacemaker using imaging guidance
$18,540
$13,905
$8,232
29
clean
Insertion of heart rhythm monitor under skin
$56,174
$42,130
$15,529
29
clean
Removal of heart rhythm monitor from under the skin
$11,473
$8,605
$5,094
29
clean
Insertion of wireless pressure sensor into lung artery through tube with review by radiologist
$86,732
$65,049
$41,189
29
clean
Repair of left upper heart chamber with implant with review by radiologist
$40,129
$30,097
$17,817
29
clean
Repair of mitral valve through the skin, initial prosthesis
$73,213
$54,910
$32,507
29
clean
Repair of mitral valve through the skin, additional prosthesis
$73,213
$54,910
$32,507
29
clean
Insertion of blood flow assist device in aorta through skin
$8,579
$6,434
$3,809
29
clean
Removal of blood flow assist device in aorta
$5,659
$4,245
$2,513
29
clean
Other heart surgery procedure
$26,599
$19,949
$7,377
319
clean
Repair of blood vessel of arm
$19,285
$14,464
$2,977
29
clean
Injection to cause blood clot in diseased or pseudoaneurysm of arm or leg
$3,472
$2,604
$1,541
29
clean
Insertion of tube into vena cava
$4,472
$3,354
$1,986
29
clean
Insertion of tube into vein, first order branch
$2,968
$2,226
$1,318
29
clean
Insertion of tube into vein, second order branch
$4,913
$3,685
$2,181
29
clean
Insertion of tube into right heart or main pulmonary artery
$23,784
$17,838
$7,068
29
clean
Insertion of tube into artery of lobe of lung
$1,665
$1,249
$739
29
clean
Insertion of needle or tube into artery of neck or brain
$578
$434
$261
29
clean
Insertion of needle or tube into artery of arm or leg
$4,395
$3,296
$1,951
29
clean
Insertion of tube into chest or arm artery, each first order branch
$2,639
$1,979
$1,172
29
clean
Insertion of tube into chest or arm artery, initial second order branch
$2,688
$2,016
$1,194
29
clean
Insertion of tube into chest or arm artery, initial third order branch
$2,767
$2,075
$1,229
29
clean
Insertion of tube into chest or arm artery, additional second, third order and beyond
$834
$625
$370
29
clean
Insertion of tube into chest aorta for diagnosis or treatment with review by radiologist
$15,785
$11,839
$7,008
29
clean
Insertion of tube into intracranial artery for diagnosis or treatment with review by radiologist
$21,570
$16,177
$9,577
29
clean
Insertion of tube into internal neck artery for diagnosis or treatment with review by radiologist
$49,070
$36,803
$12,086
29
clean
Insertion of tube into chest artery for diagnosis or treatment with review by radiologist
$21,173
$15,880
$7,068
29
clean
Insertion of tube into brain artery for diagnosis or treatment with review by radiologist
$107,464
$80,598
$26,468
29
clean
Insertion of tube into external neck artery for diagnosis or treatment with review by radiologist
$16,585
$12,439
$7,068
29
clean
Insertion of tube into abdominal, pelvic, or leg artery, each first order branch
$4,500
$3,375
$1,998
29
clean
Insertion of tube into abdominal, pelvic, or leg artery, initial second order branch
$4,706
$3,529
$2,089
29
clean
Insertion of tube into abdominal, pelvic, or leg artery, initial third order branch
$4,913
$3,685
$2,181
29
clean
Insertion of tube into abdominal, pelvic, or leg artery, additional second, third, and beyond
$2,968
$2,226
$1,318
29
clean
Other blood vessel injection procedure
$1,688
$1,266
$833
22
clean
Insertion of needle into vein (3 years or older)
$252
$189
$112
29
clean
Insertion of needle into vein for collection of blood sample
$34
$26
$9
174
clean
Transfusion of blood or blood products
$4,665
$3,499
$2,071
29
clean
Exchange blood transfusion, other than newborn
$3,602
$2,701
$1,599
29
clean
Insertion of tube into portal vein of liver
$4,925
$3,694
$2,187
29
clean
Insertion of tube into vein with collection of blood sample
$5,245
$3,934
$2,329
29
clean
Mechanical separation of white blood cells from blood
$7,710
$5,783
$3,423
87
clean
Mechanical separation of red blood cells from blood
$6,647
$4,985
$2,951
29
clean
Mechanical separation of platelet cells from blood
$4,233
$3,175
$1,880
29
clean
Mechanical separation of plasma from blood
$7,710
$5,783
$3,423
29
clean
Insertion of non-tunneled central venous tube for infusion (5 years or older)
$7,189
$5,392
$3,546
29
clean
Insertion of tunneled central venous tube for infusion (5 years or older)
$14,501
$10,876
$6,439
29
clean
Replacement of nontunneled central venous tube
$6,452
$4,839
$2,954
29
clean
Replacement of tunneled central venous tube
$14,335
$10,751
$6,365
29
clean
Replacement of tunneled central venous tube with port
$14,172
$10,629
$6,292
29
clean
Removal of tunneled central venous tube
$5,654
$4,241
$2,511
29
clean
Collection of blood sample from implanted device
$541
$405
$131
29
clean
Collection of blood sample from central venous tube
$505
$379
$125
29
clean
Declotting of central venous tube
$2,727
$2,045
$1,211
29
clean
Mechanical removal of tissue or obstructive material from central venous tube
$11,154
$8,365
$4,952
29
clean
Repositioning of central venous tube using fluoroscopic guidance
$6,452
$4,839
$2,954
29
clean
Contrast injection for imaging to evaluate central venous access device
$3,872
$2,904
$1,719
29
clean
Artery puncture collection of blood sample
$277
$208
$125
29
clean
Insertion of artery tube for blood sampling or infusion through skin
$5,564
$4,173
$2,470
29
clean
Insertion of shunts to bypass blood flow to liver with review by radiologist
$25,330
$18,998
$17,200
29
clean
Revision of shunts to bypass blood flow to liver with review by radiologist
$25,330
$18,998
$11,247
29
clean
Removal and dissolving of blood clot from vein using fluoroscopic guidance, repeat treatment on subsequent day
$7,533
$5,650
$3,716
29
clean
Biopsy of blood vessel using tube
$21,574
$16,180
$9,579
29
clean
Insertion of tube into artery or vein for drug infusion for blood clot with review by radiologist
$16,726
$12,545
$7,068
29
clean
Insertion of stent in vein with review by radiologist, initial vein
$97,063
$72,797
$43,096
29
clean
Insertion of stent in vein with review by radiologist, each additional vein
$76,322
$57,241
$33,887
29
clean
Ultrasound evaluation of blood vessel with review by radiologist, initial vessel
$11,197
$8,398
$4,972
29
clean
Ultrasound evaluation of blood vessel with review by radiologist, each additional vessel
$10,206
$7,655
$4,532
29
clean
Other procedure on blood vessel
$4,306
$3,229
$3,780
290
clean
Showing the first 200 of 3,931 code–setting items in the file, verified codes first —
every row as JSON →
Service
Severity
Rule
Detail
CPT 92511/b
warn
mrf_negotiated_above_gross
highest negotiated rate $1,652 exceeds the gross charge $671
CPT 92950/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,504
CPT 92971/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $412
CPT 92978/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $6,873
CPT 92979/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,709
CPT 93017/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,079
CPT 93260/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,764
CPT 93261/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,764
CPT 93279/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $178
CPT 93280/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $215
CPT 93281/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $178
CPT 93282/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $206
CPT 93283/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,526
CPT 93284/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,764
CPT 93286/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $483
CPT 93287/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $230
CPT 93289/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $263
CPT 93296/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $116
CPT 93313/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,885
CPT 93319/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,187
CPT 93320/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $1,924
CPT 93321/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $1,692
CPT 93325/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $1,702
CPT 93355/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,368
CPT 93356/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $401
CPT 93563/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $1,796
CPT 93564/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $1,226
CPT 93565/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,341
CPT 93566/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,423
CPT 93567/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,186
CPT 93568/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,039
CPT 93569/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,039
CPT 93571/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,965
CPT 0417T/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $188
CPT 93572/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,426
CPT 0558T/o
warn
mrf_negotiated_above_gross
highest negotiated rate $428 exceeds the gross charge $396
CPT 93574/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,039
CPT 93575/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,039
CPT 0689T/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $580
CPT 93598/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $814
CPT 0690T/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $580
CPT 93615/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $6,400
CPT 0692T/o
warn
mrf_negotiated_above_gross
highest negotiated rate $2,923 exceeds the gross charge $2,865
CPT 93616/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $6,400
CPT 0754T/o
warn
mrf_negotiated_above_gross
highest negotiated rate $33 exceeds the gross charge $29
CPT 93640/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,985
CPT 0755T/o
warn
mrf_negotiated_above_gross
highest negotiated rate $50 exceeds the gross charge $29
CPT 93644/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $6,158
CPT 93668/o
warn
mrf_negotiated_above_gross
highest negotiated rate $111 exceeds the gross charge $82
CPT 93788/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $514
CPT 31505/b
warn
mrf_negotiated_above_gross
highest negotiated rate $1,652 exceeds the gross charge $621
CPT 31605/b
warn
mrf_negotiated_above_gross
highest negotiated rate $1,652 exceeds the gross charge $1,472
CPT 94726/o
warn
mrf_negotiated_above_gross
highest negotiated rate $700 exceeds the gross charge $655
CPT 33968/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,659
CPT 36000/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $1,486
CPT 36010/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,472
CPT 36011/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,968
CPT 36012/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,913
CPT 36015/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $1,665
CPT 36100/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $578
CPT 97802/o
warn
mrf_negotiated_above_gross
highest negotiated rate $51 exceeds the gross charge $25
CPT 36140/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,395
CPT 36215/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,639
CPT 99281/b
warn
mrf_negotiated_above_gross
highest negotiated rate $1,652 exceeds the gross charge $736
CPT 36216/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,688
CPT 99282/b
warn
mrf_negotiated_above_gross
highest negotiated rate $1,652 exceeds the gross charge $1,461
CPT 36217/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,767
CPT 99292/b
warn
mrf_negotiated_above_gross
highest negotiated rate $1,652 exceeds the gross charge $431
CPT 36218/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $834
CPT 99406/o
warn
mrf_negotiated_above_gross
highest negotiated rate $70 exceeds the gross charge $43
CPT 36245/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,500
CPT 99407/o
warn
mrf_negotiated_above_gross
highest negotiated rate $70 exceeds the gross charge $47
CPT 36246/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,706
CPT 36247/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,913
CPT 36248/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,968
CPT 36481/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,925
CPT 36500/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,245
CPT 36620/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,564
CPT 37182/o
warn
mrf_negotiated_above_gross
highest negotiated rate $34,401 exceeds the gross charge $25,330
CPT A9517/o
warn
mrf_negotiated_above_gross
highest negotiated rate $48 exceeds the gross charge $15
CPT 46600/b
warn
mrf_negotiated_above_gross
highest negotiated rate $1,652 exceeds the gross charge $328
CPT A9543/o
warn
mrf_negotiated_above_gross
highest negotiated rate $113,649 exceeds the gross charge $57,377
CPT 47555/o
warn
mrf_negotiated_above_gross
highest negotiated rate $12,149 exceeds the gross charge $8,613
CPT 52630/o
warn
mrf_negotiated_above_gross
highest negotiated rate $10,062 exceeds the gross charge $4,402
CPT 71271/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,033 exceeds the gross charge $770
CPT L1906/o
warn
mrf_negotiated_above_gross
highest negotiated rate $316 exceeds the gross charge $295
CPT L1980/o
warn
mrf_negotiated_above_gross
highest negotiated rate $843 exceeds the gross charge $457
CPT L3332/o
warn
mrf_negotiated_above_gross
highest negotiated rate $182 exceeds the gross charge $48
CPT L3740/o
warn
mrf_negotiated_above_gross
highest negotiated rate $2,407 exceeds the gross charge $508
CPT L3807/o
warn
mrf_negotiated_above_gross
highest negotiated rate $562 exceeds the gross charge $412
CPT L3912/o
warn
mrf_negotiated_above_gross
highest negotiated rate $216 exceeds the gross charge $206
CPT L3931/o
warn
mrf_negotiated_above_gross
highest negotiated rate $458 exceeds the gross charge $362
CPT L3982/o
warn
mrf_negotiated_above_gross
highest negotiated rate $859 exceeds the gross charge $621
CPT L8020/o
warn
mrf_negotiated_above_gross
highest negotiated rate $558 exceeds the gross charge $545
CPT 86860/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $300
CPT 86870/o
warn
mrf_negotiated_above_gross
highest negotiated rate $673 exceeds the gross charge $387
CPT 86920/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $219
CPT 86921/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $219
CPT 86922/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $300
CPT 86923/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $219
CPT 86972/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $219
CPT 86975/o
warn
mrf_negotiated_above_gross
highest negotiated rate $838 exceeds the gross charge $387
CPT 75571/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,033 exceeds the gross charge $175
CPT 75572/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,567
CPT 75573/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,567
CPT 75574/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,567
CPT 75577/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,567
CPT 76014/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,426 exceeds the gross charge $155
CPT 76015/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,426 exceeds the gross charge $117
CPT 76016/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,426 exceeds the gross charge $407
CPT 76018/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,426 exceeds the gross charge $583
CPT 76019/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,426 exceeds the gross charge $377
CPT 76805/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $273
CPT 76810/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $273
CPT 76812/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $668
CPT 76814/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $486
CPT 76816/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $668
CPT 76820/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $584
CPT 76821/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $584
CPT 76827/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $449
CPT 76828/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $225
CPT C8921/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $3,043
CPT C8922/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $3,043
CPT 76941/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $443
CPT C8923/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $3,800
CPT 76945/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $684
CPT C8924/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $2,845
CPT 76946/o
warn
mrf_negotiated_above_gross
highest negotiated rate $784 exceeds the gross charge $251
CPT C8925/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,425
CPT C8928/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $5,007
CPT C8930/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $4,516
CPT C8937/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,426 exceeds the gross charge $68
CPT 77063/o
warn
mrf_negotiated_above_gross
highest negotiated rate $334 exceeds the gross charge $50
CPT C9176/o
warn
mrf_negotiated_above_gross
highest negotiated rate $20 exceeds the gross charge $10
CPT 78434/o
warn
mrf_negotiated_above_gross
highest negotiated rate $4,664 exceeds the gross charge $1,990
CPT G0166/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $888
CPT G0239/o
warn
mrf_negotiated_above_gross
highest negotiated rate $70 exceeds the gross charge $50
CPT G0269/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $762
CPT G0278/o
warn
mrf_negotiated_above_gross
highest negotiated rate $7,068 exceeds the gross charge $6,558
CPT 88172/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $300
CPT G0279/o
warn
mrf_negotiated_above_gross
highest negotiated rate $334 exceeds the gross charge $50
CPT G0379/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,118 exceeds the gross charge $265
CPT G0460/o
warn
mrf_negotiated_above_gross
highest negotiated rate $3,872 exceeds the gross charge $1,505
MS-DRG 094/i
warn
mrf_negotiated_above_gross
highest negotiated rate $25,586 exceeds the gross charge $22,814
MS-DRG 493/i
warn
mrf_negotiated_above_gross
highest negotiated rate $18,438 exceeds the gross charge $2,964
MS-DRG 759/i
warn
mrf_negotiated_above_gross
highest negotiated rate $12,271 exceeds the gross charge $10,171
MS-DRG 779/i
warn
mrf_negotiated_above_gross
highest negotiated rate $5,779 exceeds the gross charge $5,619
MS-DRG 794/i
warn
mrf_negotiated_above_gross
highest negotiated rate $19,523 exceeds the gross charge $15,254
CPT 88319/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,512 exceeds the gross charge $413
MS-DRG 817/i
warn
mrf_negotiated_above_gross
highest negotiated rate $15,675 exceeds the gross charge $14,393
MS-DRG 832/i
warn
mrf_negotiated_above_gross
highest negotiated rate $14,884 exceeds the gross charge $11,484
MS-DRG 880/i
warn
mrf_negotiated_above_gross
highest negotiated rate $17,645 exceeds the gross charge $12,545
CPT 88331/o
warn
mrf_negotiated_above_gross
highest negotiated rate $320 exceeds the gross charge $300
MS-DRG 881/i
warn
mrf_negotiated_above_gross
highest negotiated rate $20,826 exceeds the gross charge $14,026
MS-DRG 882/i
warn
mrf_negotiated_above_gross
highest negotiated rate $15,685 exceeds the gross charge $10,585
MS-DRG 883/i
warn
mrf_negotiated_above_gross
highest negotiated rate $19,760 exceeds the gross charge $12,960
MS-DRG 885/i
warn
mrf_negotiated_above_gross
highest negotiated rate $38,191 exceeds the gross charge $15,934
MS-DRG 886/i
warn
mrf_negotiated_above_gross
highest negotiated rate $27,187 exceeds the gross charge $16,987
CPT 88344/o
warn
mrf_negotiated_above_gross
highest negotiated rate $673 exceeds the gross charge $489
MS-DRG 897/i
warn
mrf_negotiated_above_gross
highest negotiated rate $30,887 exceeds the gross charge $13,576
MS-DRG 914/i
warn
mrf_negotiated_above_gross
highest negotiated rate $38,270 exceeds the gross charge $22,970
CPT 88362/o
warn
mrf_negotiated_above_gross
highest negotiated rate $1,512 exceeds the gross charge $951
CPT 88367/o
warn
mrf_negotiated_above_gross
highest negotiated rate $673 exceeds the gross charge $426
CPT J0470/o
warn
mrf_negotiated_above_gross
highest negotiated rate $71 exceeds the gross charge $13
CPT 81443/o
warn
mrf_negotiated_above_gross
highest negotiated rate $2,571 exceeds the gross charge $1,473
CPT 81445/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 90740/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0517/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J7030/o
info
mrf_item_fields_vary
this code and setting cover at least 10 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 81456/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 90744/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0525/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7040/o
info
mrf_item_fields_vary
this code and setting cover at least 12 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 81460/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 90746/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0558/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J7042/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 81479/o
info
mrf_item_fields_vary
this code and setting cover at least 70 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 90750/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0561/o
info
mrf_item_fields_vary
this code and setting cover at least 7 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7050/o
info
mrf_item_fields_vary
this code and setting cover at least 17 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 81519/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 90853/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0583/o
info
mrf_item_fields_vary
this code and setting cover at least 18 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7060/o
info
mrf_item_fields_vary
this code and setting cover at least 15 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 81522/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min differ, so no cross-line comparison was made for this item
CPT J0585/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J7070/o
info
mrf_item_fields_vary
this code and setting cover at least 7 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 81599/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0592/o
info
mrf_item_fields_vary
this code and setting cover at least 6 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7120/o
info
mrf_item_fields_vary
this code and setting cover at least 10 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT 82017/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0595/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J7121/o
info
mrf_item_fields_vary
this code and setting cover at least 5 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 82131/o
info
mrf_item_fields_vary
this code and setting cover at least 4 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, min, max differ, so no cross-line comparison was made for this item
CPT J0597/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J7168/o
info
mrf_item_fields_vary
this code and setting cover at least 3 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT 82150/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J0612/o
info
mrf_item_fields_vary
this code and setting cover at least 19 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item
CPT J7186/o
info
mrf_item_fields_vary
this code and setting cover at least 2 distinct chargemaster lines (modifier, billing class or unit); their gross, cash, max differ, so no cross-line comparison was made for this item